Shed clearance · Killiney

Shed clearance in Killiney, before the new shed arrives

A new shed or a garden room comes with a delivery date, and the old shed has to be gone before it. In Killiney that usually means emptying it, taking it down and carrying it up a sloping garden to the road. Spotless does all three and leaves the base clear for whoever is coming next. This page sets out the order to do it in.

The same side passage cleared, leading to the shed door
Real job · A cleared side passage leading to the door of a garden outbuilding
5.0 on Google60+ genuine reviews
Waste collection permitNWCPO-25-13287-01
Fully insuredOn every job we do
Quotes from photosWhatsApp, same day in most cases
All of LeinsterDublin, Kildare, Wicklow and every Leinster county

What we do

The old shed gone and the ground ready

Spotless empties and removes sheds, clears the garden waste around them and power washes the base. One visit to look at it, one quote, and a date that fits the delivery of the new building.

Shed clearance

Garden sheds cleared, or taken down and removed.

Garden clearance

Overgrown gardens cut back and green waste removed.

Patio cleaning

Sandstone, granite and concrete slabs, the right way.

Garage clearance

Tools, old furniture, paint tins and years of storage.

The date is set by the new one

A new shed, a summer house or a garden room is ordered weeks ahead and arrives on a day you are given. The old shed has no date at all. It is full, it leans a little, and nobody has made a plan for it.

That is the gap this page is about. Before the new building can go down, three things have to happen in the same corner of the garden: the old shed has to be emptied, it has to come down, and the ground it stood on has to be clear. Check what your supplier expects, because most want the old shed gone and the base ready when they arrive.

Our main shed clearance and removal page explains the service, and house clearance in Killiney covers the area. This page is about timing: getting an old shed out of a Killiney garden in good time for the new one.

Spotless.ie banner: Shed Clearance Killiney, the old shed out before the new one arrives. Call 085 202 1222.

Work back from the delivery date

When What to do
As soon as the new one is ordered Send us photos of the old shed and the route to the road, with the delivery date
Before we come Decide what is going into the new shed. Have an electrician disconnect any power. Empty the fuel from the mower
A few days before delivery The old shed is emptied, taken down and carried out, and the base is cleared
After that The base is measured, and washed if you want it washed, with time to dry
Delivery day The ground is clear, and what you kept is waiting to go back in

The margin matters. A shed that has stood for twenty years can hide a rotten floor, a wasps' nest or a pile of rubble from an old patio, and it is better to find those with a few days in hand than on the morning of the delivery.

What is staying

Not everything in an old shed is rubbish. Before the day, split the contents three ways.

  • Going into the new shed. The mower that works, the good tools, the bikes that are ridden.
  • Going to someone else. Things you have promised and not yet handed over.
  • Going. Everything else.

Mark the first two or list them, and they are set aside before anything else is touched. They can be left together in one place, or carried to the garage or wherever else you choose, so they are out of the way while the old shed comes down.

Outbuilding shelving and floor heaped with boxes and household items
Real job · Outbuilding shelving and floor heaped with boxes and household items

The base: measure it first

If the new shed is going on the same spot, measure the base before the old one comes down. It is the quickest way to know whether the new one will fit.

The base is often still sound even when the shed is not, so a new shed can usually go straight back on it. When the old shed has gone, we lift the floor and clear the ground of nails, screws, glass and splinters, so what is left is the bare slab or paving.

Two things we do not do. We do not break out a concrete base as part of an ordinary shed removal, so mention it if you want that looked at. And we do not lay or level a base. If the new building needs a bigger or a flatter base than the old shed had, raise that with your supplier early, because it changes their dates as well as ours.

How the old shed comes down

  1. Empty first. What is staying is set aside, and the rest is sorted as it comes out.
  2. Power checked. If the shed has electricity, an electrician must disconnect it before we start.
  3. Roof off. Felt or metal sheeting comes off first.
  4. Panels and frame. Timber sheds are unscrewed or taken apart panel by panel. Metal sheds are unbolted. Plastic sheds are unclipped or unscrewed in sections.
  5. Floor up. The floor comes up last and the base is left clear.

Old bolts are often rusted solid, rotten panels crumble and old plastic can snap instead of unclipping. None of that stops the job. It is the reason we ask for photos of the floor, the roof and the door as well as the inside.

Getting it up the garden

Many Killiney houses are set back up steep drives off the roads around the hill, and where the garden falls away the shed can be a long way below the road.

  • Steps and terraces. The shed is carried up in sections, and panels are cut down to a size two people can manage safely.
  • The drive. Where a van can get up and turn safely, we load at the house. Where it cannot, the van stays on the road and we carry to it.
  • Electric gates. The code or the remote needs to be arranged in advance.
  • The side of the house. We need the width of the gate and of the narrowest point in the passage.

A photo taken from the shed, looking back towards the house, and one of the drive taken from the road are the two most useful things you can send. The extra carrying is priced in before the day.

Overgrown side passage leading to a garden shed, with a ladder and debris
Real job · An overgrown side passage leading to a garden outbuilding
The same side passage cleared, leading to the shed door
Real job · The same passage cleared, with the way to the door open

New shed on the way? Send photos of the old shed and the route to the road, with the delivery date. You will get a fixed quote and a day that leaves the base clear in time.

Use the quote form or WhatsApp 085 202 1222.

Summer houses, playhouses and old garden rooms

It is not always a shed that is being replaced. Timber summer houses, playhouses and similar garden buildings come apart in much the same way. Send photos from outside and inside, and mention whether there is electricity, glazing or a raised deck, so we can tell you what is involved.

What is behind and beside it

Sheds rarely stand alone. Behind them and beside them there is usually something else: bags of garden waste, broken pots, a trampoline nobody uses, rubble from an old patio. Put it in your photos and it can go on the same job. Hedge cuttings, branches and bags of green waste are covered by our garden clearance service.

Small back yard with bags of garden waste, pots and debris before clearance
Real job · A small back yard with bags of garden waste, pots and debris before clearance

What we cannot take

We cannot take paint, solvents, oils, fuel, garden chemicals, batteries or gas cylinders, full or empty. We stand them together and tell you where they are. A local authority recycling centre takes household quantities of most of them, and a gas cylinder goes back to a supplier.

Some older sheds have corrugated cement roof sheets that could contain asbestos. We do not break them up or remove them. That is work for a specialist contractor, and it has to be done before the shed comes down, so allow for it in your dates.

The base washed before the new shed lands

A slab that has been under a shed for years is usually green, mossy and stained. A wash shows what condition it is in, and it is easier to do before a new building is standing on it.

Spotless power washes bases, patios and paths as well as removing sheds. The pressure and the heat are matched to the surface, and the base needs to dry off before anything is put on it. Our guide to shed clearance in Dalkey goes through the washing in more detail.

What Spotless does, in one place

Usable tools, bikes and garden furniture that you are not keeping are set aside for reuse where possible. Metal and electrical items are recycled, and timber, felt and the rest go to authorised waste facilities under our permit, NWCPO-25-13287-01. We are fully insured on every job and work Monday to Saturday, 8am to 5pm.

Before we arrive

  • Tell us the delivery date of the new shed or garden room
  • Measure the base and check it against the size of the new building
  • Mark or list what is going into the new shed
  • Have any power to the old shed disconnected by an electrician
  • Empty the fuel from mowers and strimmers
  • Mention asbestos or a wasps' nest, so nobody gets a surprise
  • Send a photo of the drive from the road

Getting a price

Send the photos and the delivery date on WhatsApp to 085 202 1222, or use the quote form on this page. You will get one written quote, and the price is fixed before we start.

The process

How a Spotless clearance works

From the first photo to the last swept floor: six steps, no surprises.

  1. Send photos

    WhatsApp or upload a few photos of what needs to go. No visit needed for most jobs.

  2. Get a fixed price

    We price by volume, access and any items that need special disposal, and confirm it before we book.

  3. We arrive

    The crew arrives when agreed, with the van and covers to protect floors and stairs.

  4. Clear & check

    Room by room. Nothing goes until you’ve had the chance to keep it, and drawers and pockets get checked.

  5. Sort & recycle

    Usable items go to reuse where possible, metals and electricals to recycling, and the rest to licensed facilities.

  6. Left tidy

    Floors swept or vacuumed where needed and the place left clear, ready for what comes next.

Got to say Ciprian was fast and thorough. Hw
He found rubbish in a shed we’d forgotten about - and offered to take that too - no extra charge. Highly recommend

Eileen Dooley Google review

The guys did a great job on my workshop clearance. They arrived on time, completed everything as expected and locked up.
I would highly recommend them for any such jobs.

Declan Hogan Google review

A brilliant service. Fast, efficient, clean and most of all friendly. Also the team were cognisant of the fact that there were bereavements in our family and showed great respect and empathy. They took the stress out of what seemed like an insurmountable job.
Thank you from the Corrigan family.
Would recommend this service to anyone staring bewildered at a house/shed/business wondering how they are going to clear this.

Colm Corrigan Google review

Reviews are copied word for word from our Google Business Profile. We don’t edit them. See more reviews.

FAQ

Questions people ask us

How long before the new shed arrives should the old one come out?

Leave a few days between the two if you can. That gives time to look at the base, measure it and wash it, and to sort out anything that turns up underneath. Tell us the delivery date when you ask for a price and we will work back from it.

Can the old shed be taken down on the morning the new one is delivered?

We would not plan it that way. Taking a shed down can run on if the bolts have seized or the floor has rotted, and the people delivering the new one may not be able to wait. A margin of a few days is safer for everyone.

Will the old base do for the new shed?

Often it will. The base is often still sound even when the shed is not, so a new shed can usually go on the same spot. Measure the base before the old shed comes down and compare it with the size your supplier gives you. We clear the base of nails, glass and debris. We do not lay or level one.

What happens to the things that are going into the new shed?

Mark them or list them, and they are set aside before anything else is touched. They can be left together in one place, or carried to the garage or wherever else you choose, ready to go back in.

The old shed has a light and sockets. What needs to happen?

An electrician has to disconnect the supply before we start. We do not touch the wiring. If the new building is going to have power as well, the same electrician can tell you what the cable can be used for.

Can you take down a summer house, a playhouse or an old garden room?

Usually, yes. Timber summer houses, playhouses and similar garden buildings come apart much like a shed. Send photos from outside and inside, and mention whether there is electricity, glazing or a raised deck.

The garden slopes and there are steps up to the road. Can you still get the shed out?

Yes. It is carried up in sections, and panels are cut down to a size two people can manage safely on steps. Where a van cannot get up the drive, it stays on the road. Send a photo of the route, and the extra carrying is in the price from the start.

Does everything go, including the floor, the felt and the glass?

Yes. The roof, the panels and the floor all leave with us, and the ground is cleared of nails, glass and splinters. Timber, metal and glass are kept apart where possible, and the metal goes for recycling.

The roof is grey corrugated sheeting. Is that a problem?

It can be. Corrugated cement roof sheets on older sheds may contain asbestos, and those have to be dealt with by a specialist contractor before the shed comes down. Tell us before we quote. We do not break them up or remove them, but we can still clear the contents.

Can the base be washed before the new shed goes on it?

Yes. We power wash bases, patios and paths, and need an outside tap and a power socket we can reach. The base has to dry off before a new building is put on it, which is one more reason to leave a few days in hand.

Free, no-obligation quote

Tell us about the job

A few photos and the area is all we need. You’ll get a fixed price back, usually the same day, by WhatsApp, phone or email.

Get a free quote

Tell us what needs doing and add a few photos. We reply with a price, usually the same day.

What do you need?
Please tell us a little about the job.
Photos (optional, but they help us price it accurately)
Add photosTap to take or choose up to 4 photos. We shrink them before sending.
Which area is the job in?
Please add your name.
We need a number to send your quote.
That email doesn’t look right.
Best way to reply

We only use your details to reply about this job. See our privacy policy.

Prefer WhatsApp? Send your photos straight to 085 202 1222.

  1. Send photosOn WhatsApp or the form, with the area or Eircode.
  2. Get a fixed priceUsually the same day. No visit needed for most jobs.
  3. We clear itYou keep what you want, and the rooms are left swept.
Our box van with tail lift and a panel van, both loaded with crates, boxes and furniture from a house clearance
Our vans, loaded at the end of a clearance

An excellent service from Ciprian . Sheds and attics cleared and left spotless. Great communication from start to finish. I would highly recommend this company.

Margaret Bannister Google review
5.0 60+ Google reviews · read them on Google Authorised waste carrierPermit NWCPO-25-13287-01 Fully insuredOn every job we do